Super Air Meter values closely correlate with air void spacing in fresh concrete for better prediction of long-term freeze thaw durability than total air content alone. Results for both air void spacing and standard air content are determined on-site in 10 minutes instead of waiting weeks for expensive laboratory evaluation.
Equipment
Grinding and Grooving Machines
May 22, 2024
Equipment
HEM SFP1800 Overlay Paver
March 11, 2024